Composite Floor & Decking
We deliver creative & cost-efficient solutions that are responsive to each site conditions.
The benefits of composite construction include speed of construction, performance and value. Steel framing for a structure can be erected quickly and the pre-fabricated steel floor decks can be put in place immediately. When cured, the concrete provides additional stiffness to the structure.
At Construction Muzzy we ensure to implement all the best practice guidelines while building composite floor & decking such as;
Checking all back propping details against Floor Decking Drawings, Ensure the Floor Decking is Reasonably clean and free of Dirt, Check all reinforcement against the slab reinforcement Drawings, Ensure all reinforcement is supported so that it does not become displaced during the concreting operation and other steps.
Composite floor consists of a concrete topping cast onto metal decking. We use metal decking then concrete, either lightweight or normal weight, is pumped onto the decking to make up the composite system.
CONTACT
Inquiries
For any inquiries, questions or commendations, please call: 01992 807852 or fill out the following form
Contact Us
Head Office
M25 Business Centre, 121 Brooker Road,
Waltham Abbey, EN9 1JH
Employment
To apply for a job at Construction Muzzy Ltd, please send a cover letter together with your C.V. to: info@constructionmuzzy.co.uk
Find us on Social Media